Roads & Geometric Design Capability


Engineering roads that perform today and endure tomorrow.

Structures: Bridge Engineering


Engineering bridges built for strength, safety and longevity.

Transport Planning & Traffic Engineering


Planning and engineering traffic for today’s demands and tomorrow’s growth.

Mowana Engineers

Years of
Engineering
Excellence

  • Mowana Engineers
  • Mowana Engineers

Welcome

Mowana Engineers is a Level 1 BBBEE company, based in Bellville, specialising in transportation engineering (roads, structures, and transport planning/traffic engineering) and operating throughout South Africa and Africa. We service clients from all spheres of government, developers, contractors, the mining industry, and other consultants.


Our services include roads and geometric design, bridge engineering, transportation planning, traffic engineering, specialised traffic accommodation plans, abnormal load route determination, pavement design and borrow-pit investigations, stormwater design, road signage and markings, as well as contract management and construction supervision.


Our ideal client is one who is prepared to embrace innovative and sustainable solutions that do not compromise design standards or safety.

Our Latest Projects

A showcase of our latest infrastructure and engineering work.

Why Choose Us

We deliver forward-thinking engineering solutions that are environmentally responsible and backed by proven expertise.

Innovation

Innovation

Chapman's Peak Drive is notorious for rocks falling onto the road. To replace high maintenance catch fences a canopy structure is proposed. Using specialised software, a portal structure has been designed over a portion of the road to absorb the impact and to direct rocks over the road towards the sea, to replace existing safety nets.

Sustainability

Sustainability

The roundabout at the Buitengracht Road entrance to the Waterfront was converted to two signalised intersections. The design and implementation of the conversion was done in such a manner that these busy intersections remained open to pedestrians and vehicles during the full period of the project.

Competency

Competency

A rail over road bridge on the Sishen-Saldanha rail line was damaged by an abnormal load travelling on the road beneath, forcing the closure of the rail line. A temporary bridge was designed and installed, allowing the bridge to reopen 12 days after the damage occurred.
 

Let’s Build Your Vision Together

From roads and bridges to transport planning and civil design, our team is ready to
bring your project to life.